Section 83 of The Telangana Municipal Tramways (Construction, Operation and Maintenance) Act, 2008. — All the assets and liabilities of the Metro Rail Limited including rolling stock, machinery shall stand transferred to and vested in the State Government on the expiry of the concession period
Loading the PDF…
The text of this section could not be extracted from the source document — it is published as a scanned PDF. Read it in the original above.